Taupo Roundabout
Scope
In May 2024, our dedicated team successfully completed the surfacing of the new roundabout at Wairakei in Taupō over a three-day period. The project began with our skilled chipsealing crew applying a high-quality membrane seal coat, ensuring a strong foundation for the subsequent asphalt layer.
Following this, our asphalt paving team expertly placed 430 tonnes of asphalt, meticulously planning their operations to minimise traffic disruption and deliver a seamless driving experience. To achieve the smoothest transitions, we utilised our advanced 1.3m Wirtgen mill to effectively mill any cold joints.
Our state-of-the-art Sumitomo paver, equipped with a versatile screed that easily adapts from 2.1m to 6m without the need for boxing out, facilitated efficient and flawless paving runs. The result is a durable and smooth surface that enhances both safety and comfort for all road users.
What our Clients say
See how we've earned the trust of our clients through exceptional service and reliable results.