Rotorua Roundabout

Scope

The conversation of T intersection into a new 3 leg Roundabout was constructed under live traffic conditions at the intersection of SH30/33. Full depth existing pavement excavation was required for this project down to get to new subgrade levels and tie into the existing bridge, from here geogrid and geocloth was used in conjunction with subgrade improvement layers to provide a stable base for our pavement. Subbase layer was a stabilised granular layer followed by structural asphalt for the base course construction.

Traffic Management / Service relocation / Retaining / Guardrail / Line Marking and Concrete works were also delivered through this project.

Project details

Duration:
Location:
Rotorua

Gallery

No items found.

What our Clients say

See how we've earned the trust of our clients through exceptional service and reliable results.

"Very happy with results. Thanks for your knowledgeable advice. Fast, efficient, and tidy. Great to work with, nothing a problem. Will definitely use this company again!"

Laurie

“I would definitely recommend MS Civil to others – when the time comes, they all get stuck into the job and give it 100%”

Ryan Armstrong – Lockerbie Estates

“The work you are doing is great, every time I drive through it is a productive and tidy looking operation - Your team are all over it and easy to deal with, thank you for the hard work getting this project operational!”

Roger Greaves - NZTA