Hospital Hill Retaining Wall
Scope
The construction of a 180m long retaining wall on SH43 Consisted off Encased piles 6m - 16m long. This project was under permanent 1 way stop/go traffic control for the duration of this work to enable safe working room for the workers.
Significant cut to waste and cut to fill was completed along with a stabilised work platform 6m wide to enable drilling and wall construction. Groundwater management / Drilling / Lagging / anchors concrete works / pavement and kerbing was completed.